您現(xiàn)在的位置:首頁(yè) - 雅思 - 聽(tīng)力

劍橋雅思16Test4Part2聽(tīng)力原文與答案Local council report on traffic and highways

2023-05-20 14:38:56 來(lái)源:中國(guó)教育在線

劍橋雅思16Test4Part2聽(tīng)力原文與答案Local council report on traffic and highways,今天中國(guó)教育在線就來(lái)為大家分析這個(gè)問(wèn)題

Local council report on traffic and highways

當(dāng)?shù)卣嘘P(guān)交通與高速公路的報(bào)告

劍橋雅思16 Test4 Part2雅思聽(tīng)力原文

CHAIRPERSON:Right.Next on the agenda we have traffic and highways.Councillor Thornton

COUNCILLOR THORNTON:Thank you.Well,we now have the results of the survey carried out last month about traffic and road transport in the town.People were generally satisfied with the state of the roads.There were one or two complaints about potholes which will be addressed,but a significant number of people complained about the increasing number of heavy vehicles(Q11)using our local roads to avoid traffic elsewhere.We’d expected more complaints by commuters about the reduction in the train service,but it doesn’t seem to have affected people too much.The cycle path that runs alongside the river is very well used by both cyclists and pedestrians since the surface was improved last year but overtaking can be a problem so we’re going to add a bit on the side to make it wider(Q12).At some stage,we’d like to extend the path so that it goes all the way through the town,but that won’t be happening in the immediate future

The plans to have a pedestrian crossing next to the Post Office have unfortunately had to be put on hold for the time being.We’d budgeted for this to be done this financial year,but then there were rumours that the Post Office was going to move,which would have meant there wasn’t really a need for a crossing.Now they’ve confirmed that they’re staying where they are,but the Highways Department have told us that it would be dangerous to have a pedestrian crossing where we’d originally planned it as there’s a bend in the road there(Q13).So that’ll need some more thought.

On Station Road near the station and level crossing,drivers can face quite long waits if the level crossing’s closed,and we’ve now got signs up requesting them not to leave their engines running at that time(Q14).This means pedestrians waiting on the pavement to cross

the railway line don’t have to breathe in car fumes.We’ve had some problems with cyclists leaving their bikes chained to the railings outside the ticket office,but the station has agreed to provide bike racks there.

CHAIRPERSON:So next on the agenda is‘Proposals for improvements to the recreation ground’.Councillor Thornton again.

COUNCILLOR THORNTON:Well,since we managed to extend the recreation ground,we’ve spent some time talking to local people about how it could be made a more attractive and useful space.If you have a look at the map up on the screen,you can see the river up in the north.and the Community Hall near the entrance from the road.At present,cars can park between the Community Hall and that line of trees to the east,but this is quite dangerous for pedestrians so we’re suggesting a new car park on the opposite side of the Community Hall,right next to it(Q15).We also have a new location for the cricket pitch.As we’ve now purchased additional space to the east of the recreation ground,beyond the trees(Q16),we plan to move it away from its current location.which is rather near the road,into this new area beyond the line of trees.This means there’s less danger of stray balls hitting cars or pedestrians

We’ve got plans for a children’s playground which will be accessible by a footpath from the Community Hall and will be alongside the river(Q17).We’d originally thought of having it close to the road.but we think this will be a more attractive location.

The skateboard ramp is very popular with both younger and older children-we had considered moving this up towards the river,but in the end we decided to have it in the southeast corner near the road(Q18).The pavilion is very well used at present by both football players and cricketers.It will stay where it is now–to the left of the line of trees and near to the river(Q19)–handy for both the football and cricket pitches And finally,we’ll be getting a new notice board for local information,and that will be directly on people’s right as they go from the road into the recreation ground(Q20).

劍橋雅思16 Test4 Part2雅思聽(tīng)力答案

11.C

12.A

13.B

14.B

15.C

16.F

17.A

18.I

19.E

20.H

>> 雅思 托福 免費(fèi)測(cè)試、量身規(guī)劃、讓英語(yǔ)學(xué)習(xí)不再困難<<

- 聲明 -

(一)由于考試政策等各方面情況的不斷調(diào)整與變化,本網(wǎng)站所提供的考試信息僅供參考,請(qǐng)以權(quán)威部門(mén)公布的正式信息為準(zhǔn)。

(二)本網(wǎng)站在文章內(nèi)容出處標(biāo)注為其他平臺(tái)的稿件均為轉(zhuǎn)載稿,轉(zhuǎn)載出于非商業(yè)性學(xué)習(xí)目的,歸原作者所有。如您對(duì)內(nèi)容、版 權(quán)等問(wèn)題存在異議請(qǐng)與本站聯(lián)系,會(huì)及時(shí)進(jìn)行處理解決。

語(yǔ)言考試咨詢
HOT
培訓(xùn)費(fèi)用測(cè)算
英語(yǔ)水平測(cè)試
1
免費(fèi)在線咨詢
免費(fèi)獲取留學(xué)方案
在線咨詢
英語(yǔ)自測(cè)
留學(xué)方案
關(guān)注公眾號(hào)
  • 麗雅老師
  • 小皮老師
  • 小倩老師
  • 小雅老師